Erection & Installation
Field erection and installation, including field-erected bulk storage tanks and SITC of chilled water systems.

Scope of service
- Field erection of bulk storage tanks
- Installation of tanks, structures and supports
- SITC of chilled water (CHW) systems
- Rapid, safe field assembly
Process
From design to handover
01
Design for Manufacturing
Engineering optimised for fabrication and field fit.
02
Material Control
Raw material verification and traceability.
03
Fabrication
Qualified welding and controlled shop fabrication.
04
Testing & NDT
RT, DPT, UT, VT, leak and functional tests.
05
Erection & Handover
Safe field assembly, commissioning support and documentation.
Have a project in mind?
Tell us about your product or engineering requirements. Our team will get in touch with you.
